FGT think your best choice in the future
System Integration Designers in FGT
Five major pipeline usage licenses
"Five major pipelines" refers toFive basic water, electricity, and mechanical/electrical systems must be reviewed and implemented during the period from the commencement of construction to obtaining an occupancy permit.Understanding the following application process and key concepts will help you keep track of the construction project's progress:
I. What are the five major pipelines? Basic definitions and classifications
In Taiwan's construction projects,What are the five major pipelines (current construction methods use seven major pipelines)?This is fundamental knowledge that every owner, engineer, and contractor must understand. Based on building codes and practical experience,What are the five major pipelines?It can be defined from two main perspectives:
What are the five major pipelines? Which ones require review?
- Electrical (Power): Includes both external and internal power distribution lines of Taiwan Power Company. (O requires a license)
- telecommunications: This includes telephone and internet cabling from Chunghwa Telecom (or other operators). (Currently under the jurisdiction of low-voltage electrical engineering contractors (license required).)
- Water supply: Water supply from the water company and indoor piping. (O requires a license)
- drain: Rainwater and wastewater discharge pipes. (O requires a license plate)
- Firefighting:Fire hydrants, fire alarms, sprinkler and smoke extraction systems. (O requires a license)
- air conditioner:Air conditioning equipment water supply and drainage, and air conditioning piping. (No license required for X)
- gas:Gas equipment requires pipelines. (O requires a license)
II. Application Process and Timing
Procedures and requirements for obtaining a mechanical and electrical license
I. Five Major Pipelines
1. Taipower: Mounting → Safety Inspection → Design → Fee Verification → Payment → Obtaining Road Permit → External Line Construction (before construction work on damaged roads).
2. Water Supply: Application → Design → Billing → Payment → Obtaining Road Permit → External Line Construction. (If the first phase of water supply has been completed on the first floor, only proof of payment and a commitment letter are required for this stage.)
3. Telecommunications: Mounting → Security Inspection → Design → Obtaining Road Permit → External Line Construction (before construction work on damaged roads).
4. Gas: Application → Design → Billing → Approval → Payment → Road Permit Request → External Line Construction. (Before Construction Due to Building Damage) (For cases where a gas application is not required, a written commitment is sufficient).
5. Sewerage: Drawings → Application → Design → Road Permit Application → External Construction. (Located in areas where dedicated sewerage is completed) (For cases without pipework, a road excavation exemption certificate from the Sanitation Department will be issued) (Road excavation exemption certificate can only be processed after the roof slab inspection is completed).
- After the building permit is issued: After obtaining a construction permit, the five major pipelines typically submit a design application to the relevant competent authority (such as Taiwan Power Company or Taiwan Water Corporation).
- Construction phase: External line construction and pipeline laying can only proceed after the drawings have been reviewed by the relevant pipeline companies, fees have been paid, and road permits have been obtained.
- When applying for a license: Upon completion, the contractor and supervisor must submit a completion inspection report, along with documentation confirming the fire safety equipment's compliance. Only after the construction management unit conducts a joint inspection and confirms everything is in order will an official "Occupancy Permit" be issued.1, 2, 3, 4, 5]
For further information on detailed drawing review procedures or inspection regulations, please visit [website address].Taiwan Construction Research InstituteorMinistry of the Interior's Regulations Sharing SystemPlease consult the latest Building Code and regulations.1]
From the perspective of introducing public external pipelines
What are the five major pipelines?Includes the following systems:
- Electrical wiring – Power supply system managed by Taiwan Power Company
- Telecommunications pipeline – Communication systems managed by the NCC Communications Committee and the Taiwan Telecommunications Engineering Industry Association, etc.
- Water supply pipeline – Water supply system managed by Taiwan Water Corporation
- sewage pipeline Municipal wastewater treatment system
- gas pipeline – Natural gas or liquefied petroleum gas supply system
- Air conditioning ductwork - the system used by air conditioning equipment
- Fire protection piping - systems used for fire protection equipment
From the perspective of general interior building construction
In interior building constructionWhat are the five major pipelines?This includes:
- Electrical wiring – Building internal power distribution system
- Telecommunications pipeline – Building internal communication wiring system
- water supply pipeline – Water supply piping inside the building
- Drainage pipes – Building internal drainage system
- Fire protection pipelines – Building fire safety equipment pipelines
- Air conditioning piping – Building air conditioning equipment piping
- Gas pipelines - building internal gas systems
This is the complete answer.What are the five major pipelines (now seven)?Both of these classification methods are important because they involve different competent authorities and application procedures.
II. Differences between public external pipelines and indoor pipelines
| Classification perspective | Pipeline system | competent authority | Scope of responsibility | Technical Specifications |
|---|---|---|---|---|
| Public external pipelines | Electrical wiring | Taiwan Power Company | From distribution panel to electricity meter | High-voltage power distribution standards |
| Telecommunications pipeline | Chunghwa Telecom | Main line to customer service point | Fiber optic/copper wire standards | |
| Water supply pipeline | Water company | Supervisor to water meter | Water supply pressure standard | |
| sewage pipeline | City Hall | Building to supervisor | Wastewater treatment standards | |
| gas pipeline | Gas Company | Supervisor to gas meter | Gas safety standards | |
| Fire protection pipelines | Municipal Fire Department | Supervisor to fire equipment | Fire protection standards | |
| Indoor piping | Electrical wiring | Building owners | All wiring after the meter | Indoor wiring rules |
| Telecommunications pipeline | Building owners | Wiring after the service point | Low-voltage system standards | |
| water supply pipeline | Building owners | All piping after the water meter | Water supply equipment standards | |
| Drainage pipes | Building owners | Building drainage | Drainage Equipment Standards | |
| Fire protection pipelines | Building owners | Fire equipment piping | Fire equipment standards | |
| gas pipeline | Building owners | Gas equipment piping | Gas safety standards |
understandWhat are the five major pipelines?Different classifications help clarify the responsibilities and management methods of each system. Public external pipelines are maintained by the respective professional agencies, while indoor pipelines are managed by the building owner.
III. Detailed introduction of each of the five major pipeline systems
3.1 Electrical wiring system
In discussionWhat are the five major pipelines?At that time, electrical wiring was one of the most basic systems. Taiwan's electrical system uses a dual voltage system of 110V/220V with a frequency of 60Hz.
Technical specifications and features:
- Residential electricity: 110V single-phase power supply
- Commercial and industrial electricity: 220V three-phase power supply
- Piping materials: EMT steel pipe, PVC pipe
- Safety protection: residual current circuit breaker, grounding system
3.2 Telecommunications cabling system
What are the five major pipelines?Among these, telecommunications infrastructure has become even more important with the advent of the 5G era. This mainly includes telephone lines, internet lines, and cable TV lines.
System components:
- Fiber optic backbone: supports high-speed network transmission
- Copper twisted pair: Traditional telephone lines
- Coaxial cable: cable television signal
- Low-voltage wiring: a conduit system for protecting electrical circuits.
3.3 Water supply/tap water pipeline system
Water supply system isWhat are the five major pipelines?The system most directly related to people's livelihoods is responsible for providing clean and safe drinking water.
Pipe materials and specifications:
- Main components: Ductile iron pipes, stainless steel pipes
- Piping types: PVC pipe, PE pipe
- Indoor piping: copper pipes, stainless steel pipes
- Water pressure standard: 1.5-3.5 kg/cm²
3.4 Drainage/Sewage Piping System
Drainage systemWhat are the five major pipelines?The central government is responsible for treating domestic sewage and rainwater to ensure environmental sanitation.
System Classification:
- Wastewater system: treats domestic wastewater
- Rainwater system: collects and treats rainwater
- Combined sewer system: sewage and rainwater share the same pipeline
- Septic tank: a preliminary sewage treatment facility
3.5 Gas/Fire Protection Piping System
at last,What are the five major pipelines?Both the gas pipelines (public external pipeline angles) and fire protection pipelines (indoor pipeline angles) included are closely related to safety. Currently, these two categories are reviewed separately.
Gas pipeline features:
- Natural gas: Urban gas fuel
- Liquefied petroleum gas (LPG): The main choice in rural areas
- Safety equipment: emergency shut-off valve, leak alarm
- Regular inspections: Ensure safe use
Fire protection pipeline functions:
- Automatic sprinkler system: automatically activates in case of fire.
- Fire hydrant system: manual fire extinguishing equipment
- Smoke extraction system: removes dense smoke during a fire.
- Alarm System: Fire Detection and Notification
IV. Application Process and Documents for the Five Major Pipelines
learnWhat are the five major pipelines?After that, the most important thing is to understand the application process. According to building regulations, the following documents must be prepared when applying for approval to start construction on the five major pipelines:
Required application documents
- Building permit – Basic proof of a legal building
- Site location map of the base – Detailed labeling of each pipeline connection point
- Application for joint road excavation for permanent residential water, electricity, telecommunications, gas, and sewage pipelines for new users – Unified application for all systems
- Scheduled pipeline construction schedule – Coordinate the construction schedules of various trades
Application process steps
| step | Homework content | Responsible unit | Time required | Precautions |
|---|---|---|---|---|
| 1 | Prepare application documents | Building owners | 1-2 weeks | Ensure document integrity |
| 2 | Submit a joint application | Building owners | 3-5 days | Submit all system applications at once |
| 3 | Surveying and inspecting pipeline authorities | Pipeline companies | 2-4 weeks | Coordinate the time for the site visit |
| 4 | Payment completed and verification | Building owners | 1 week | According to each company's fee schedule |
| 5 | Issuance of road excavation permit | Road authorities | 1-2 weeks | Construction can only begin after the acquisition is obtained. |
masterWhat are the five major pipelines?The application process helps shorten project timelines and avoid regulatory issues.
V. Coordination and Site Visit Procedures by the Competent Authority
In applicationWhat are the five major pipelines?During the system inspection, surveying the pipeline management authorities is a crucial step. The main surveying authorities include:
Supervisory authorities of each system
- Water company – Responsible for the site survey of the water supply system
- Taiwan Power Company – Responsible for electrical system site survey
- Chunghwa Telecom – Responsible for the site survey of the telecommunications system
- Gas Company – Responsible for gas system survey
- Relevant municipal government departments – Responsible for site survey of sewage/drainage systems
Key points of the site visit
| Pipeline system | Reviewing unit | Key points of the site visit | Technical Requirements | Safety considerations |
|---|---|---|---|---|
| Electrical wiring | Taipower | Location and capacity requirements of power distribution equipment | Compliant with indoor wiring regulations | Leakage protection, grounding safety |
| Telecommunications pipeline | NCC appointed unit | Computer room location and cable routing | Compliant with telecommunications equipment specifications | Electromagnetic interference protection |
| water supply pipeline | Water company | Water consumption calculation and pipe diameter selection | Meets water supply equipment standards | Water quality protection and backflow prevention |
| Drainage pipes | Municipal Water Resources Bureau | Drainage slope, confluence direction | Meets drainage equipment standards | Preventing blockages and controlling odors |
| Gas/fire pipelines | Municipal Fire Department | Safe distance, emergency equipment | Meets fire protection equipment standards | Explosion-proof design and escape planning |
| Air conditioning pipes | Owners' autonomy | Building interior cooling, setup | Meets air conditioning equipment standards | Exhaust and drainage planning |
Through a comprehensive site visit procedure, ensureWhat are the five major pipelines?The systems all meet safety standards and usage requirements.